§ 235-15. Permits; fees.  


Latest version.
  • The Town shall not permit a cross-connection within the public water supply system unless it is considered necessary and that it cannot be eliminated.
    A. 
    Cross-connection permits that are required for each backflow prevention device are obtained from the Town. A fee of $75 will be changed for the initial permit and $50 for the renewal of each permit.
    B. 
    Town permits shall be renewed every one year and are nontransferable. Permits are subject to revocation and become immediately revoked if the owner should so change the type of cross-connection or degree of hazard associated with the service.
    C. 
    A permit is not required when fixture isolation is achieved with the utilization of a nontestable backflow preventer.